Blake Samper

Examples of previous work.

Hydroscape – EPA Campus Rainworks Challenge

Here are some images from a team project designing a new phase of campus development keeping stormwater and pollutant runoff remediation in mind. I worked on this project alongside my project partner Kent Elliott for the EPA Campus Rainworks Challenge. More information on this competition can be found at http://water.epa.gov/infrastructure/greeninfrastructure/crw_challenge.cfm

Precedent study conducted before the design began

Precedent study conducted before the design began

Early Concept Plan

Early Concept Plan

Illustrative Master Plan

Illustrative Master Plan

Birds Eye

Birds Eye

Water flow diagram

Water flow diagram

Intensive and extensive green roof section

Intensive and extensive green roof section

Bioswale function illustration

Bioswale function illustration

Graywater cistern located inside seat wall. The water recycled from the nearby building can then be used for irrigation

Graywater cistern located inside seat wall. The water recycled from the nearby building can then be used for irrigation

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Information

This entry was posted on March 6, 2013 by .
%d bloggers like this: